Light Construction/IMR 

C-Innovation has been providing comprehensive light construction and inspection, maintenance, and repair (IMR) services for over 15 years since our inception.

LIGHT CONSTRUCTION

Our light construction capabilities include both the installation or decommissioning of subsea trees, rigid and flexible jumpers, flying leads, manifolds, suction piles and vast array of other subsea infrastructure. Our turnkey construction services include equipment storage and mobilization, project management, logistics management, installation engineering and offshore execution management. C-Innovation’s delivery of offshore construction services is set apart from our competitors due to the wealth of intercompany resources, assets and facilities available to us through the ECO network of companies.

Mad Dog 2 SFL Loadout
Mad Dog 2 SFL Loadout
light_construction1
previous arrow
next arrow
 
light_construction1
light_construction2
light_construction3
light_construction4
light_construction5
light_construction6
light_construction7
previous arrow
next arrow

CONTACT US TODAY

Our Team of Subsea Experts is Ready to Help.

Inspection, Maintenance and Repair (IMR)

C-Innovation has a long history of providing IMR services globally including seabed to surface full field HD video inspection, cathodic protection surveys, photogrammetry with 3D modeling, NDT including ACFM, UT and CT, LiDAR laser scanning and modeling, and cleaning with abrasive or high-pressure water blasting up to 15kpsi. Our project management team plans complex IMR campaigns comprised of multi discipline offshore inspection teams and technologies to meet the overall inspection plan goals. C-Innovation also maintains a relationship with over a dozen specialized inspection and survey service providers to stay on the leading edge of technology advancements in the sector.   

IMR Applications:

  • Platform inspection
  • Hull inspection
  • Pipeline inspection
  • Leak detection
  • Tooling repair
  • Component swaps
Island Venture Bridge at night
Island Venture Bridge at night
imr4
previous arrow
next arrow
 
imr4
imr3
imr2
imr1
previous arrow
next arrow

ISOLATION API STANDARD

C-Innovation’s subsea services group practices the API 65-2 Isolation Standard for isolating potential flow zones, ensuring well integrity during subsea construction operations. We instill flow detection practices in offshore personnel.

KEY PROJECTS

  • C-Innovation plays a key role in first oil at Salamanca for LLOG Exploration
    C-Innovation (C-I), an affiliate of Edison Chouest Offshore (ECO) and its family of companies, has successfully completed a series of light construction campaigns on the Salamanca field in the Gulf of America in partnership with LLOG Exploration and Pinnacle Engineering. The completion of major subsea installation operations utilized the company’s specialized marine assets and technical… Read More
  • C-Innovation Completes Successful Decommissioning Project in Gulf of America
    C-Innovation (C-I), an affiliate of Edison Chouest Offshore (ECO) and its family of companies, has successfully completed the decommissioning of the Joliet tension leg platform (TLP) in the Gulf of America (GOA). Joliet was the oldest TLP installed in the GOA, originally installed in 1989 in 1,725 ft of water. The decommissioning contract involved the… Read More
  • C-Innovation Successfully Completes Stem Clamp Installation on BP’s Mad Dog Spar
    C-Innovation, LLC (C-I), an affiliate of Edison Chouest Offshore (ECO) and its family of companies, has completed the installation of several stem clamps for BP beneath the Mad Dog Spar in the Gulf of Mexico, utilizing its subsea inspection, maintenance and repair (IMR) remotely operated vehicle (ROV) vessel, MV Dove. Throughout the planning process, several risks… Read More
  • Flowline Hydrate Remediation
    Client: W&T Offshore Project: Fastball Flowline Hydrate Remediation   Scope of Work Remediation/removal of complete hydrate blockage and flushing of flowline to satisfy government requirements for decommissioning was performed.  The project took 19 days to complete. The tie-back well had already been de-completed and the jumper removed. Access was through a high-flow Hotstab port on a… Read More