Goal-Zero-Hero—Paulo-Rei—July-2022 | QHSE

Paulo Rei (ROV Superintendent)was recognized for the observation and actions taken during the XT’s Flow Module removal operation, identifying that, after a crane movement, the suspended load was above subsea structures, then he requested to move the suspended load to a safe area, on 05th July 2022.