Project Management

C-Innovation possesses a diverse team of project managers with decades of experience, well equipped to take any project from concept through offshore execution. Additional on staff project support resources include coordinators, cost controllers, project administrators and document controllers. Each project team is assembled on a case-by-case basis tailored to a client’s specific needs. This flexibility ensures the most efficient and cost-effective solutions are delivered to our clients. Our project management capability includes full life cycle management from equipment design, fabrication, construction, and offshore execution ensuring each schedule milestone and budget is adhered to throughout every step of the project.

WE HAVE THE EXPERIENCE

Our team applies innovation and know-how to achieve client-specific benchmarks and project success.

KEY PROJECTS

  • C-Innovation Successfully Completes Stem Clamp Installation on BP’s Mad Dog Spar
    C-Innovation, LLC (C-I), an affiliate of Edison Chouest Offshore (ECO) and its family of companies, has completed the installation of several stem clamps for BP beneath the Mad Dog Spar in the Gulf of Mexico, utilizing its subsea inspection, maintenance and repair (IMR) remotely operated vehicle (ROV) vessel, MV Dove. Throughout the planning process, several risks… Read More
  • Flowline Hydrate Remediation
    Client: W&T Offshore Project: Fastball Flowline Hydrate Remediation   Scope of Work Remediation/removal of complete hydrate blockage and flushing of flowline to satisfy government requirements for decommissioning was performed.  The project took 19 days to complete. The tie-back well had already been de-completed and the jumper removed. Access was through a high-flow Hotstab port on a… Read More
  • Acid Stimulation of Wells
    Client: Anadarko Petroleum Company (APC) Project: Acid Stimulation of Wells Location: KC875 #1 (Lucius), GC770 #1 (Caesar-Tonga), and GC683 #3 (Caesar-Tonga)   Scope of Work The prescribed acid treatment to stimulate each well was pumped down dual, open-water coiled tubing (CT) downlines to the subsea well location. The TEI 15K STIM package was used to… Read More
  • Flowline Segment Hydrate Remediation
    Client: Eni Petroleum Project: Longhorn Flowline Segment Hydrate Remediation Location: Gulf of Mexico, Mississippi Canyon, Block 502   Scope of work The primary objective of this project was to clear the flowline of a hydrate blockage to restore production from well #3. The extent of hydrate formation was unknown. The only access was through 1”… Read More