Vessels

As a member of the Edison Chouest Offshore group of companies (ECO), C-Innovation offers integrated ROV and vessel support services unmatched in the industry. C-Innovation’s association with these industry-leading companies extends to its customers who receive the resources of a vast vessel fleet, multiple shipyards, expansive port facilities, and cutting-edge logistics & communications services.

C-Installer
Contact C-Innovation
C-Fighter
C-Installer-Above
enforcer
IslandVenture
ISLAND-PERFORMER-HOLIDAY
C-Installer
contact_C-Innovation
previous arrow
next arrow
C-Fighter
C-Installer-Above
enforcer
IslandVenture
ISLAND-PERFORMER-HOLIDAY
C-Installer
contact_C-Innovation
previous arrow
next arrow

CUSTOMER TESTIMONIAL

“I wanted to thank and commend the entire team for the successful installation of the first tubing head onboard the Holiday. Also, the first subsea installation performed with remote survey – a huge accomplishment that will help drive future innovation with Guyana operations.”

SUBSEA FIELD DEVELOPMENT READY

“With the addition of the Island Performer, we have an additional vessel to assist with subsea field development supporting new installations, commissioning and monitoring of subsea assets.”

FLEET HIGHLIGHTS

Island Venture

DP3
Dimensions: 524ft x 98ft (159.7m x 30m)
Deck Area: 25,618 ft2 (2,380 m2
POB Capacity: 239
Crane: 3000m 400Te AHC, 2550m 140Te AHC
ROV: (2) Schilling UHD work class
Helideck rated for Sikorsky S-92

Spec Sheet

Island Intervention

DP3
Dimensions: 394ft x 82ft (120m x 25m)
Deck Areas: Main Deck 15,000 ft2 (1,400 m2)
Moon Pool 26ft x 26ft (8m x 8m)
POB Capacity: 130
Crane: 250Te AHC 3000m Wire
ROV: (2) Schilling UHD work class

Spec Sheet

Island Performer

DP3
Dimensions: 426ft x 82ft (129m x 25m)
Deck Areas: Main Deck 8,611ft2 (800 m2)/Shelter Deck, 9,687ft2 (900 m2)
Moon Pool 26ft x 26ft (8m x 8m)
POB Capacity: 130
Crane: 250Te AHC 3000m Wire
ROV: (2) 200HP Schilling UHD work class
Helideck rated for Sikorsky S-92

US Spec Sheet

International Spec Sheet

C-Constructor

DP2
Dimensions: 319ft x 66ft (97m x 21m)
Deck Areas: Main Deck 8,165ft2 (758 m2)
POB Capacity: 99
Crane: 150Te AHC 3000m Wire
ROV: (2) Schilling UHD work class
Helideck rated for Sikorsky S-92

Spec Sheet

Holiday

DP2
Dimensions: 288ft x 66ft (87.78m x 20.12m)
Deck Area: 5,793 ft2 (538 m2)
POB Capacity: 58
Crane: 3000m 150Te Hydramarine HMC 3568 LKO
ROV: (2) 200HP Schilling UHD work class
Helideck: Rated for Sikorsky S-92 helicopter. Certified under CAP 437, day or night operations

Spec Sheet

Kirt Chouest

DP2
Dimensions: 288’ x 66’ (87.78m x 20.12m)
Deck Area: 7,474 ft2 (692.36 m2)
POB Capacity: 58
Crane: 3000m 150 MT Knuckle Boom, (2) x 5-ton deck cranes.
ROV: (2) Schilling UHD work class (1 x Gen 200hp 1 x Gen 3-250hp)

Spec Sheet

C-Installer

DP2
Dimensions: 318.67’ x 66’ (97.13m x 20.12m)
Deck Area: 9,944 ft2(924 m2)
POB Capacity: 76
Crane: 3000m 150 MT Knuckle Boom
ROV: (2) 200HP Schilling UHD work class

Spec Sheet

KEY PROJECTS

  • C-Innovation Successfully Completes Stem Clamp Installation on BP’s Mad Dog Spar
    C-Innovation, LLC (C-I), an affiliate of Edison Chouest Offshore (ECO) and its family of companies, has completed the installation of several stem clamps for BP beneath the Mad Dog Spar in the Gulf of Mexico, utilizing its subsea inspection, maintenance and repair (IMR) remotely operated vehicle (ROV) vessel, MV Dove. Throughout the planning process, several risks… Read More
  • Flowline Hydrate Remediation
    Client: W&T Offshore Project: Fastball Flowline Hydrate Remediation   Scope of Work Remediation/removal of complete hydrate blockage and flushing of flowline to satisfy government requirements for decommissioning was performed.  The project took 19 days to complete. The tie-back well had already been de-completed and the jumper removed. Access was through a high-flow Hotstab port on a… Read More
  • Acid Stimulation of Wells
    Client: Anadarko Petroleum Company (APC) Project: Acid Stimulation of Wells Location: KC875 #1 (Lucius), GC770 #1 (Caesar-Tonga), and GC683 #3 (Caesar-Tonga)   Scope of Work The prescribed acid treatment to stimulate each well was pumped down dual, open-water coiled tubing (CT) downlines to the subsea well location. The TEI 15K STIM package was used to… Read More
  • Flowline Segment Hydrate Remediation
    Client: Eni Petroleum Project: Longhorn Flowline Segment Hydrate Remediation Location: Gulf of Mexico, Mississippi Canyon, Block 502   Scope of work The primary objective of this project was to clear the flowline of a hydrate blockage to restore production from well #3. The extent of hydrate formation was unknown. The only access was through 1”… Read More